top of page
CONSTRUCTION

Glenmore-Crowchild Bridge (Calgary, AB)
Negative curved form work for pedestrian bridge, west ramp

Glenmore-Crowchild Bridge (Calgary, AB)
Negative curved form work for pedestrian bridge, east ramp

Glenmore-Crowchild Bridge (Calgary, AB)
Negative form work for pier caps

Mui Kwok Buddhist Temple (Edmonton, AB)
Over 1000 original clay ornaments, tile and ridge pieces were replicated in foam, reducing the weight by 65%.

Mui Kwok Buddhist Temple (Edmonton, AB)
Over 1000 original clay ornaments, tile and ridge pieces were replicated in foam, reducing the weight by 65%.

Bow River Bridge (Cochrane, AB)
Form work for bridge pier caps

Westbrook Bridge (Calgary, AB)
Negative form work for pedestrian bridge ramps and pier cap

Westbrook Bridge (Calgary, AB)
Negative form work for curved upstand curbs between bridge and ramps

Timberlands (Red Deer, AB)
3D decorative exterior wall panels throughout strip mall
bottom of page